• 论文
主办单位:煤炭科学研究总院有限公司、中国煤炭学会学术期刊工作委员会
复合顶板大断面开切眼锚网索支护技术研究
  • Title

    Study on bolt-mesh-anchor support technology of open-off cut with compound roof and large cross section

  • 作者

    王宏志张东升王旭锋张胜龙程继鑫

  • Author

    WANG Hongzhi,ZHANG Dongsheng,WANG Xufeng,ZHANG Shenglong,CHENG Jixin

  • 单位

    中国矿业大学矿业工程学院煤炭资源与安全开采国家重点实验室

  • Organization
    1.School of Mines,China University of Mining and Technology,Xuzhou ,China;2.State Key Laboratory of Coal Resources and Safe Mining,Xuzhou ,China
  • 摘要
    为解决复合顶板大断面开切眼支护难题,根据王家岭煤矿20106工作面大断面开切眼的地质条件,通过物理模拟试验分析了复合顶板大断面开切眼围岩变形破坏特征,结果表明:大断面复合顶板开切眼顶底角及顶板易变形破坏,开切眼扩帮期间围岩变形破坏明显超过掘巷期间围岩变形,提出了具有针对性的围岩控制对策,确定工作面开切眼采用"二次成巷+锚网索+单体液压支柱"联合支护方式,现场工程实践结果显示,开切眼最大离层量为9 mm,最大断面收缩率为6.6%,支护方案较好地控制了大断面开切眼的围岩变形。
  • Abstract
    In order to solve the support problem of open-off cut with compound roof and large cross section, based on the geological conditions of No.20106 working face of Wangjialing Coal Mine, physical simulation was carried out to analyse the failure characteristics of surrounding rocks. Results showed that the corner and roof of open-off cut were easy to deform and destroy.The deformation and damage of surrounding rock during the second excavation were obviously higher than that during the first excavation. The counter measures for surrounding rock were pointed out. It was determined that the combined support of tunneling in twice+bolt-mesh-anchor+hydraulic pillar should be adopted in the open-off cut.The results of field obserbation showed that the maximum separation of open-off cut was 9 mm and the maximum section shrinkage was 6.6%.The support scheme effectively controlled the deformation of surrounding rock of open-off cut with large section.
  • 关键词

    复合顶板大断面开切眼支护技术二次成巷

  • KeyWords

    compound roof ;large cross section ;open-off cut;support technology;tunneling in twice

  • 基金项目(Foundation)
    国家科技重大专项资助项目(2011ZX05061);
  • 相关文章
相关问题

主办单位:煤炭科学研究总院有限公司 中国煤炭学会学术期刊工作委员会

©版权所有2015 煤炭科学研究总院有限公司 地址:北京市朝阳区和平里青年沟东路煤炭大厦 邮编:100013
京ICP备05086979号-16  技术支持:云智互联